
About
Experience
Electrical Engineer (Intern)
K-Electric BIN QASIM POWER STATION (BQPS-01)
2022 — 2022
Main Focuses Were: Operation, Design, Maintenance, Protection & HSEQ. Worked in Electrical & Mechanical Department, Operation, HSEQ, Performance, and Workshops. Main Learning Objectives and Performed Tasks were: - Conducted thermography using thermal imaging at KE-BQPS-1, assessing 59 mechanical areas with proper PPE. - Performed vibration tests on SAH Pump, Centrifugal Pump, and Steam Air Heater Pump motor & pump at KE-BQPS-1, prioritizing safety. - Revamped cathodic protection for National Gas N_2 pipelines at SSGC, enhancing gas line safety. - Visited and analyzed load balancing between KE-BQPS-1 & KE-BQPS-3 at ICI-Line (PW-4), TSL/SL-3. - Visited and inspected the Underground Cable Duct Area (-4m) under work permit along with the KE-BQPS-1 & 3 Electrical Team with KE-BQPS-3 Chinese Engineers. - Periodically visited the Control and Operational Room of Unit-1, 2, 3, 4, 5, & 6 where Unit-3 & 4 Control and Operational Room is obsolete to learn operation and control. - During internship period Unit-1 Generator and Steam Turbine Trip overnight and go through the situation of Main Generator & ST tripping and its diagnosis process and restarting the generator. - Visited the CW Area and understand the process of water screening and filtration from the sea water to condensate pump. - DC-Grease Pump Motor repair at Work-Shop-05. - Visited all 6 Units battery rooms along with KE-Electrical Team to prevent and diagnose the issue of battery room DC Supply tripping to the control room during Blackout. - Involved and Understand Partial discharge test of GCB (Gas Circuit Breaker) in GIS. - Involved and Understand GIS 〖SF〗_6 gas filling & refilling Process. - Edited the Gas Quality Results Report of 〖SF〗_6 gas results test of Bays on MS. Excel. - Did the Switching and Lighting Health Assessment Survey by visiting total 140 different places, buildings and departments of whole KE-BQPS-1 plant. - Did the Health and Safety Assessment with Electrical Team of Electrical Department at KE-BQPS-1. - Experienced the whole process. As on 3rd October 2022 there was a high Vibration fault observed during the “Vibration test” of FDF-1 (Force Draft Fan) of Unit-2, which cause a damage to Drivent (in board bearing) and Non-Drivent (on board bearing) of FDF. - To ensure Safety, there is a Safety meeting held on Tuesday every week by KE-BQPS-1. - Attended all the safety meetings for 9 weeks internship period. Accomplished Projects During the Internship: - Created comprehensive SLD for KE-BQPS-1 plant on ETAP 19.0, including detailed labeling and thorough explanations in the internship report. - Designed SLD for BQPS-1 Unit-5 & 6 Common System "6.6kV Start-Up Sub- Division Switchgear Busbars (A3BCA & A3BCB)" requiring back feed from BQPS-2 "6.6 Sub- Division Switchgear Busbars" using available spare feed and circuit breaker. - Developed an updated SLD for BQPS-1 Unit-3 & 4 Common System, establishing the feed from "Main 220kV Bus to 6.6kV Start-Up Sub- Division Switchgear Busbars (A2BCA & A2BCB)" to "0.4kV Sub- Division Switchgear Busbars (A2BFC & A2BFD) - (Main Distribution Board)" with proper labeling.
Power System & IoT (Intern)
ZIMCO International Corporation
2022 — 2022
Main Focuses Were: Power Systems, LinkedIn Profile, Electrical Panel, Terminal Blocks, Electrical Protection Systems, Relays, Control Panel Design & Wiring, and Control Panel Components. Worked with a team of fellow Interns as a Lead Member. Main Learning Objectives and Performed Tasks were: - Approximate price calculation of Single-Phased Distribution Box in Karachi. - Made the schematics and labeled the diagram of the Control Panel. - LinkedIn profile building. Received Certificate of LinkedIn 7th Profile Rating from Optimixers. - Attended a session on Occupational Safety emphasizing hazard identification, risk management, and safety protocol implementation for the workplace.
