About
Erection of 220/132/11 KV Substation.
Monitoring the operation of 220 KV/132/11 KV Grid Stations
Protection of Power system (7SJ6025, MIF II, CDG61, CDG21, RC20, MICKRO 2200, and DEESYS,
Buchoulze Relay , FC95, FC 096 etc etc).
Supervision of installation of Busbar schemes, Grounding, Earthing and Lightening protection
systems (Furse )
Construction works like Sizing, installation and site execution of electrical equipment (Circuit
Breakers, Cables, Conduits, DBs ,SMDBs, Trenches, Cable Trays, UPS, Generators, , Motors,
Transformers, and Panels etc) and underground cabling
Supervision and execution of more than 20 projects and multiple projects at a time
LV Panels ((MCC, PCC,PFI, AMF, ATS, STAR-DELTA, POWER DBs, and MOR etc).
Power Generation field (Caterpillar, Kohler, ASKA,CUMMINS etc)
11KV HV Switchgear with VCB Panels (Incoming, Outgoing, Industrial, Consumer, Bus coupler,
Metering panels)
Electrical cable laying and installation underground/above ground.
Prepare preventive maintenance and emergency schedule for cement plant motors.
