RecruiterPk — Pakistan's leading job board
Haris Bhutto

Haris Bhutto

Mechanical Engineer

Jamshoro, Sindh, PakistanEngineering

About

EXPERIENCE: BOILER MECHANICAL ENGINEER AT HARBIN ELECTRIC INTERNATIONAL Client: Water and Power Development Authority / JPCL, Pakistan Project: Construction of 2 X 660 MW Coal-Fired Power Project Jamshoro, Pakistan. From: July 2021 to the present date Major Responsibilities: • To ensure the construction, fabrication, and erection of the following 2 X 660 MW Boiler components as per the Quality Control and Quality Assurance standards and following the compliance of all EHS procedures and protocols. • Sofa Burners, Super Heater, Re-Heater, Economizers, Valves, Air preheater, Pumps, High-pressure critical piping. • Follow KKS codes for equipment and review plant system diagrams and recommend appropriate changes as required at the site. QHSE INCHARGE AT ASIA ENGINEERS. Client: United Energy Pakistan Limited (UEPL) Oil and Gas Industry. Projects: Fabrication, Erection, and Installation of Piping, Structure, Valves, and Fittings for the following projects: Sales Gas Compressors, Flow Lines, Slug Cather, Mini-Blow Case, Pressure Vessels, Storage Tanks, Condenser (Coolers) etc. From: August 2019 to July 2021. Achievements: • Preparation of site QA/QC Plan. • QA/QC documentation of plant piping construction as per ASME pressure piping codes: B31.1 Power Piping, B31.3 Process Piping, B31.4 Pipeline Transportation Systems for Liquid Hydrocarbons, B31.8 Gas Transmission and Distribution Piping Systems. • Worked on codes involved in material specifications such as API - American Petroleum Institute Standards, ASTM American Society of Testing Materials, ASME Piping Components Standards, etc. • QA/QC documentation and welding inspection at United Energy Pakistan Limited (Oil and Gas Industry) following WPS 004, WPS 001, Welding Procedure Specification for piping and structure welding • ENTS 102, ENTS 400 codes and standards for Surface preparation. • Facilitated HSE audits and implemented action plans for items that surfaced from the audit findings. • Assisted project manager in making sure the progress at the site following the new drawing revisions and project quality plan. • Participated in meetings and discussions with clients and contractors regarding issues. • Monitored contractors to ensure timely and economic performance in accordance with company requirements. • Carried out Investigation, Closeout & Improvement of Non-Conformance Report (NCR). • Prepared TRA (Task Risk Assessment) for critical job activities. • Enforced safety standards and discipline on site, introduced changes whenever necessary, as subtly as possible, to avoid disrupting existing processes.

Experience

Mechanical Engineer

Harbin Electric International

2021Present

QHSE In-Charge

Asia Engineer

20192021

QA/QC Engineer

Future Gulf Technical Contractor

20182019

Education

BE. Mechanical

Quaid e Awam University of Engineering Science and Technology

20142017