RecruiterPk — Pakistan's leading job board
Home/Candidates/Engineering/ANEES ABBAS LARIK
ANEES ABBAS LARIK

ANEES ABBAS LARIK

Senior manager PD and Mills Utilities

About

ANEES ABBAS House # R-60, Sehrina Garden Safora Chowrangi-Karachi-Pakistan [email protected] / +92 333 282 1641     DOB: 25.02.1990 Marital Status: Married Health Issues: None (AH)     §  OBJECTIVE A challenging position in professional environment that promotes growth, efficiency and achieving company goals.   STRENGTHS   §  Strong communication skills §  Systematic and highly detail oriented §  Exceptional analytical & problem-solving skills §  Ability to multi-task in a busy work environment §  Proven leadership and team building experience §  Flair for innovation and continual improvement §  Effective as a team player and independently with minimal supervision §  Energy Management System as per compliance of ISO 50001   QUALIFICATION     §  Master of Engineering (Energy Management) NED University of Engineering and Technology Karachi CGPA. (2.89 ) 2022 §  Bachelor of Engineering MECHANICAL ENGINEERING Quaid-Awam University of Engineering Science & Technology 1st Div. (81.17%) 2012 §  HSC Pre Engineering A-Grade (75.90%) 2008 Bahria Foundation College Ranipur §  SSC Science Bahria Foundation College Ranipur A-1-Grade (81.64%) 2006 §  Specialty Subjects -Thermal Design   - Procurement Analysis and Cost cutting - Engineering Economics   - Maintenance and Engineering Solutions - Co-Generation   - Projects Planning and Development - Control Systems   - §  Computer Skills -Microsoft Office - ERP Systems - MS Project - AutoCAD §  Typical Activities, Tasks and Assignment     Preparation of Operational Procedures Project Feasibility Studies (Payback, IRR) Personnel Planning, Labor Management Procurement Planning & Evaluation Operational & Maintenance Management Inspection Visits, Technical Meetings Shifts Management (3 or 2 Shifts) Commissioning & Performance Testing Emergency & Contingency Planning Maintenance of Facilities & Equipment Spare Parts Inventory Management Project Implementation Plans/Schedules FAST TRACK Project Execution Energy Conservation Implementation Plans In-House Team Development for Execution of Small Mini Projects across all divisions   §  EXPERIENCE ON POWER-HOUSE Gas Engines, Steam Turbine AIR CONDITIONING / HVAC Absorption & Electric Chillers BOILER PLANT Package Boilers, WHRBs WASTE-WATER Treatment RO WATER Treatment Turkey/Italy Vendors USA/Italy Vendors FIRE-FIGHTING Systems, Balance of Plant PUMPING Systems Network Developed In-house Grundfoss, KSB, CNP, Pentair Etc. ELECTRICAL T&D Systems (Grid + Island, HT, LT) PLC SYSTEMS & Related Instrumentation ABB, Schneider, PEL, Siemens Etc. Siemens, Mitsubishi, Allen Bradley Etc. UTILITY COMPANY Dispute Resolution SSGC, KE, KWSB AIR COMPRESSORS Cooper, Atlas Copco             PROFESSIONAL EXPERIENCE   §     EBRAHIM TEXTILE – Senior Manager Engineering, Projects Development / Mill Utilities           10.01 - Present      Managing all Energy Projects & Mill utilities including Own Captive Power Plant, Gas/ Coal /thermal oil-Fired boilers (BONO, Bosh, Cochran, Razzaq, DDFC), Hot water, Caustic recovery Air Compressors, ETP, RO plants and other consumables of a processing unit.    Designing, Selection & procurement of Efficient Power Plant Engines gas fired boilers, including civil construction PEB Shades, ventilation system, cooling towers etc.    Exhaust Heat recovery from all heat sources in Power Plant I.e. Jacket Water Heat Recovery, Exhaust Heat utilization with maximum recovery & steam output.    Utilization of Drain Caustic up to 75% by Designing of Caustic recovery plant at minimum utilization of steam, with innovative new ideas related to mechanical & electrical designs. It includes new tank designs, their cleaning mechanisms, operational procedures and its related recoveries.    Planning and organization water sources and specially bore water by designing and selection appropriate design to get maximum water from UG. For that water, designing and selection of Reverse Osmosis Plant with its maximum usage.    Cost Analysis of operations of Utilities and engineering department for maximum saving of allocated powers.                         PROFESSIONAL EXPERIENCE (CONT.) §     EBRAHIM TEXTILE - Manager Projects Development / Mill Utilities      07.18 – 10.21      Managing all Energy Projects & Mill utilities including Own Captive Power Plant, Gas/ coal /thermal oil-Fired boilers (BONO, Bosh, Cochran, Razzaq, DDFC), Hot water, Caustic recovery Air Compressors, ETP, RO plants and other consumables of a processing unit.    Designing, Selection & procurement of Efficient Power Plant Engines gas fired boilers, including civil construction, ventilation system, cooling towers etc.    Exhaust Heat recovery from all heat sources in Power Plant I.e. Jacket Water Heat Recovery, Exhaust Heat utilization with maximum recovery & steam output.    Utilization of Drain Caustic up to 75% by Designing of Caustic recovery plant at minimum utilization of steam, with innovative new ideas related to mechanical & electrical designs. It includes new tank designs, their cleaning mechanisms, operational procedures and its related recoveries.    Planning and organization water sources and specially bore water by designing and selection appropriate design to get maximum water from UG. For that water, designing and selection of Reverse Osmosis Plant with its maximum usage.    Cost Analysis of operations of Utilities and engineering department for maximum saving of allocated powers. PROFESSIONAL EXPERIENCE (CONT.) §     OMNI GROUP - Plant Mechanical Engineer / Manager Utilities                            05.15-07.18      Managing all Energy Projects & Utilities including Captive Power Plant      O&M on 13.2 MW Power plant Battery Comprising JGS 620-F Jenbacher Gas Engines.  Project Management, Commissioning, Operation and Maintenance experience of Combine Cycle Waste Heat Recovery Boiler with 900 kWe Steam Turbine and Balance of Plant.    Project Management, Commissioning and Operation of hot water Lithium Bromide absorption Chiller on Jacket Water of JGS 620-F Jenbacher gas Engines.    Cost Analysis of operations of Utilities and department for maximum saving of allocated powers.      Develop full-scale project plans and associated communications documents. Effectively communicate project expectations to team members in a timely and clear fashion.    Procurement of machine parts, machines, engineering tools and other accessories but negotiation with suppliers and with changes in the demands.    Coach, mentor, motivate and supervise project team members and contractors, and influence them to take positive action and accountability for their assigned work.    Proactively manage changes in project scope, identify potential crises, and devise contingency plans.   PROFESSIONAL EXPERIENCE (CONT.) §     EBRAHIM TEXTILE – Mechanical/Utility Engineer                                               04.13-05.15      Looking after day to day power house operations and maintenance work.    Cost Analysis of complete power house.          

Education

BE

QUEST NAWABSHAH

20092012