
About
5 years of experience in Oil and Gas.
1 year (Well Interventions Engineer)
Delivered comprehensive technical support to drilling and completions team, enhancing
operational proficiency.
• Conducted site surveys before commencing drilling projects ensuring accurate work
planning.
• Reviewed daily reports (drilling, mud, workover, completions and mud log) from field
engineers, making necessary adjustments to improve operations efficiency.
• Ensured adherence to environmental regulations during all phases of drilling activities.
• Managed on-site operations for safe and efficient drilling execution.
• Coordinated with suppliers for timely delivery of materials and supplies, avoiding any
delay in
operations.
• Coordinated logistics for transportation of heavy machinery, streamlining operations.
• Collaborated with geologists, enhancing understanding of subsurface formations for
precise
drilling.
• Prepared cost estimates, AFEs and monitored expenditures.
• Executed 30 drilling, workover and P&A projects in MKK, MIM, KKI & KN zones
consistently
exceeding time, cost and quality objectives.
• Successfully took part in execution of casing while drilling in KKI and MKK zones.
• Improved drilling operations efficiency with thorough planning and execution of fluids
management procedures.
• Understood BHA types (Rotary & Motorized - Packed/Fulcrum/Pendulum, Vortex and
Directional, working principle of MWD, LWD & DD tools (RSS and Geo-Pilot).
• Executed several successful fishing operations.
• Successfully executed jet pump, gas lift & cased hole gravel pack completions in KKI & KN
zones.
• Ensured surge & swab pressures while drilling / casing, formation samples analysis,
changes in
drilling parameters with formation lithologies and marking boundaries between different
rock
layers, lost circulation.
• Ensured well control measures to prevent blowouts and other hazards.
• Ensured SOPs of dewatering and clarification processes to treat waste-water-based
mud
deriving from drilling activities.
• Prepared Casing, Tubing and Drilling BHA tallies.
• Conducted internal HSE audits/inspection and assurance surveys.
3 years (Drilling Fluids Engineer)
Managed drilling fluids inventory, ensuring adequate supply for projects.
• Optimized drilling fluid properties by conducting regular mud checks and laboratory tests,
forecasting potential problems before occurred.
• Ensured SOPs for effective management of water-based and oil-based mud systems.
• Worked with Gel mud, KCl Polymer PHPA, Silicate and Hydro Guard mud systems,
• Understood API cement classes, supervised mixing and placement of cement (Primary -
Single
& Multistage, Inner String and Squeeze cementing and Cement Plugs)
• Monitored cementing operations to ensure that they are carried out safely and efficiently,
troubleshooted and resolved cementing problems.
1 year (Wellsite Drilling Engineer)
Executed intervention operations, including wireline, coiled tubing, slickline, surface well
testing & swabbing operations, hydraulic fracturing operations, wellbore cleanout,
throughtubing fishing & milling, nitrogen kickoff, sand and cement plug placement, acid
stimulation, downhole pressure and temperature surveys, through tubing perforations,
permanent and retrievable plugs placement etc.
• Executed artificial lift technologies in depleted wells including jet pump, swabbing
assisted gas
lift, plunger lift, coiled tubing gas lift etc.
• Conducted well integrity surveys and reservoir surveillance operations to ensure the
maintenance of wellheads and overall, well integrity.
• Worked closely with completion, production & reservoir engineers to design and
implement
effective intervention strategies.
• Ensured detailed risk assessment while preparing well intervention work programs.
• Prepared daily operations report, cost estimates, AFEs and monitored expenditures.
Experience
Wellsite Drilling Engineer
United Energy Pakistan Limited
2021 — Present
Education
Bachelors of Engineering
Petroleum and Gas Engineering
Ned University of Engineering and Technology
2017 — 2021
